Utility Paving corner plot

Time : 4 days

Completed : August 2019

Description This area, which measured 15m2 required a lot of digging by hand, as a digger wouldn't pass through the gate. We removed a big portion of the soil, and then laid a concrete slab' patio, as well as gravel for drainage, which would be later used as a utility area for bins and all sorts. Also, wood boards were used to stop the next neighbours' gravel falling from their driveway.